To the Editor:
I would like to congratulate the mayor of Waukon and last year’s city council, along with the engineering group that planned out the street project for Third Street NE. The street looks great, but they took a neighborhood that had no problems in the June 24th, 2013 flood and got it flooding with only a 1-3/4 inch rain shower on Saturday, June 7th, 2014. They raised the grade from 8 inches to 18 inches over the original grade and put it above the sidewalks and adjoining properties. The 6 inch area that runs along the street, which I thought was the curb and gutter, will have to be renamed the curb and dam. When anybody in the construction crew was confronted and asked why the street and curb were so high, they would say, “This is what the plan calls for.”